Application For Soil Displacement Permit

What to expect: When your application is submitted, you will be shown a receipt. You will also receive an email from noreply@skipthepaper.com. If you do not receive the email, please check your email program's spam filter and spam settings.

Required fields are indicated with red.

Applicant's Address
First Name:
Last Name:

Business Name:

Street 1:

Street 2:

City:
State:
Zip/Postal:


Email (will receive email updates):
Phone:
Job Site Address

Street 1:

Street 2:

City:
State:
Zip/Postal:


Lot / Tract No.:
Geocode:
Section:
Township:
Range:
Property Owner

First Name:
Last Name:

Street 1:

Street 2:

City:
State:
Zip/Postal:


Owner Contact Phone:
Owner Email (will receive email updates):
Person performing work

First Name:
Last Name:

Business Name:

Street 1:

Street 2:

City:
State:
Zip/Postal:


Contact Phone:
Question Section
QuestionAnswer
General Questions
Do you have certification
Is the site cleaned up
What is the proposed activity
Depth of proposed excavation
Estimated volume of soil to be disposed (cubic yards) - You can get help calculating this by using this website link: http://dirtguyexcavating.com/excavation_calculator.htm
Present your method for controlling contaminated soil and dust. Examples include: spraying down the area before and during the project, do not work on windy days (in excess of 15 mph), and cover loads with a tarp.
What is your source of replacement soil
Where will the excavated soil be disposed of
Approximate project start date
Approximate project end date
Job Requirements
You agree to address personal protection issues as appropriate - for example: use coveralls, boots, etc.
You agree to control offsite tracking by limiting routes in and out of the site, and rinsing off personal and heavy equipment before they leave the site.
You agree to control soil erosion run-on and run-off.
You agree to separate clean soil from contaminated soil as directed.
You agree to dispose of excess material as directed - use the EPA approved Repository.
You agree that imported earthen material must meet ICP requirements - no more than 50 ppm for lead, 30 ppm for arsenic.
Specific Attachments
NOTE: PDF, JPG and GIF files are allowed. File size limit is 10 Megabytes.
Items marked with * are required. 

Site layout / work plan

Please Read
Terms and Conditions

By clicking on the button below, you agree to the terms and conditions outlined above.



ORME Application v3.0